Sunday, July 20, 2008

Accomplishments

A lot got done today. Jon cleaned the basement. Mike installed the entry way light (the Dave fixture). Mike and I nailed in the floor trim in the kitchen. Mike and Jon are now fixing Polly's bench. The leak we thought was in the laundry room was actually the hose being clogged on the AC drain. And finally, the water softener was fixed (new hose to drain).

1 comment:

Dave Allen said...

Looks great! Perfect for that area! I am impresed and I know you both like the gift :-)