Wow. August 23 was the last update we had on anything "us" related.
We have been busy, but nothing wow factor to write about.
The main deck is pretty much done, just have to do the steps. Can't do the steps until we get the lower deck in. Steps to getting lower deck in are daunting and having the city involved isn't helping. I drew up plans for the lower deck and included measurements of the existing deck. Those plans were approved. Now we have to break up the cement side walk, dig the post holes, have the city come out and inspect the holes; then we can fill them, build the framing, and then we have to have the city come out again. After that should be the easy part - lay down each board and screw them down. Then, of course, the city has to come out again and inspect the finished project.
Other house projects have been put on hold until we can get the outside done. Not too worried about inside because it can be done in the 6-9 months of winter that MN gets.
Subscribe to:
Post Comments (Atom)
1 comment:
6-9 is all?
Don't you mean 9-11 months of winter?? :)
Post a Comment